Aerotrain expected to be operational by Jan 31, 2025 at KLIA - Anthony Loke
Anthony Loke said the inspection will start this October and the Aerotrain will be tested using the actual track.
Mon Sep 02 2024
Aerotrain KLIA bakal beroperasi semula 31 Januari depan
Perkhidmatan Penggerak Penumpang Automasi (Aerotrain) di Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) dijangka beroperasi semula pada 31 Januari depan.
Mon Sep 02 2024
Aerotrain KLIA dijangka beroperasi semula pada suku pertama 2025
Langkah itu selaras dengan pelan penggantian Aerotrain di Terminal 1, KLIA yang dijadual siap sepenuhnya pada 31 Jan, 2025.
Wed Jul 17 2024
Projek aerotrain KLIA dijangka siap lebih awal menjelang 31 Jan 2025 - MAHB
Dalam kenyataan hari ini, MAHB berkata jangkaan itu adalah dua bulan lebih awal daripada tarikh asal siap pada 31 Mac 2025.
Tue Jun 18 2024
Aerotrain 90 peratus siap, MAHB diharap selesaikan isu kontrak - Loke
Set pertama Penggerak Penumpang Automasi atau aerotrain di Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA), kini dalam pembinaan di Wuhu, China, telah hampir 90 peratus siap.
Sun Oct 22 2023
Set pertama aerotrain KLIA di China hampir 90 peratus siap - Anthony Loke
Siew Fook meninjau perkembangan perkhidmatan penggerak penumpang automasi atau aerotrain Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) di kilang pemasangannya di Wuhu, China.
Sun Oct 22 2023
Perubahan drastik KLIA Terminal 1 dalam masa tiga tahun - Loke
Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) Terminal 1 akan mengalami perubahan drastik dalam masa tiga tahun.
Mon Jun 26 2023
One KLIA aerotrain expected to start operating next year - Loke
Anthony Loke his ministry has instructed MAHB to ensure that works to upgrade the system are completed on schedule or earlier.
Wed Jun 14 2023
Satu aerotrain KLIA dijangka beroperasi tahun depan - Loke
Satu daripada dua perkhidmatan Penggerak Penumpang Automasi atau aerotrain di Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) Terminal 1 dijangka beroperasi tahun depan.
Wed Jun 14 2023
Aerotrain replacement underway, one rail line on track to operate next year - MAHB
Prior to the suspension, the 25-year-old aerotrain service received much backlash over frequent breakdowns.
Fri May 12 2023
Perkhidmatan aerotrain KLIA dihentikan sementara
Keputusan tersebut diambil susulan insiden membabitkan aerotrain terkandas kira-kira 3 petang di KLIA semalam, membabitkan 114 penumpang.
Thu Mar 02 2023
MAHB implements mitigation measures to overcome aerotrain operation problems at KLIA - Anthony Loke
The shuttle buses between the main and satellite terminals will operate around the clock as a mitigation measure to overcome the problem of instability of the aerotrain service at the KLIA.
Sat Jan 07 2023
Penambahan bas 'shuttle' dan kakitangan langkah tangani isu aerotrain KLIA - Anthony
Penambahan bas shuttle dijangka mengurangkan kebergantungan kepada aerotrain dengan masa perjalanan pula dalam tempoh empat minit.
Sat Jan 07 2023
Tiada niat malukan sesiapa, Subkhiddin Salleh tegur sistem pengangkutan aerotrain KLIA
Kemudahan Aerotrain di Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) tidak sepatutnya rosak terutama di waktu puncak musim percutian.
Fri Dec 23 2022
Program penggantian aerotrain KLIA dimuktamadkan pada 2025 - MAHB
Program penggantian 'aerotrain' di Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA) dijangka selesai menjelang 2025, kata Malaysia Airports Holdings Bhd (MAHB).
Mon Sep 05 2022