Abdul Rahman: ECRL cost increase due to additional distance, new lines
The RM9 billion overrun in the cost for the construction of the East Coast Rail Link (ECRL) was due to the extension of rail lines from Gombak to Port Klang, increasing the total distance to 688km.
Wed Nov 09 2016