UTAMAMALAYSIADUNIAPOLITIKVIDEOHIBURANSUKANGAYA HIDUPBISNESENGLISHPODCASTFOTORANCANGANTEKNOLOGI

Carian mengenai topik Igan Bridge

Dapatkan berita terkini mengenai Igan Bridge dari Astro Awani

Construction of nine bridges connecting coastal road network in Sarawak to be ready in 2024 - CM

Construction of nine bridges connecting coastal road network in Sarawak to be ready in 2024 - CM

The construction of all nine bridges crossing and connecting the network of coastal roads in Sarawak is scheduled to be completed in 2024, said Chief Minister Datuk Patinggi Abang Johari Tun Openg.
Sat Sep 12 2020
No toll at Lanang Bridge, says Sarawak CM

No toll at Lanang Bridge, says Sarawak CM

Sarawak Chief Minister Tan Sri Adenan Satem said the decision was made to ease the burden of the people in Sarawak from being burdened with toll charges.
Wed Apr 29 2015